Facility;Client;Development Stage;Year;Note
Off-Site Facilities of ZMT-250 Motor Fuel Refinery;LUKOIL-Kogalymneftegaz Company, Kogalym;Detailed Design Documentation;1995;Commissioned in 1997
Unit for Treating Drip Oil and Oil Sludge;Turkmenbashi Refinery, Turkmenbashi,Turkmenia;Technical and Commercial Proposal;1996
Recycling Water Supply Unit;Turkmenbashi Refinery, Turkmenbashi, Turkmenia;Technical and Commercial Proposal;1997
Oil Products Metering Unit;LUKOIL-Uraineftegaz Company, Urai;Detailed Design Documentation;1997-1998;Commissioned in 1998
Feedstock Supply Unit at the Catalytic Reforming Unit;LUKOIL-Uraineftegaz Company, Urai;Detailed Design Documentation;1997-1998;Commissioned in 1998
Light Oil Products Loading Rack;Korimos Company, Moscow;Detailed Design;1998;Commissioned in 1999
Gas Distributing Point. Upgrading;Stabilizatsia Company, Nizhnevartovsk;Detailed Design;1998;Commissioned in 1999
Flare System. Upgrading;Cracking Company, Saratov, OC SIDANKO;Technical and Commercial Proposal;1999
Chemical Laboratory. Upgrading;Volgograd Company Neftezavodmontazh, Nizhnevartovsk Research and Production Corp, Nizhnevartovsk,TNK-BP;Detailed Design;1999;Commissioned in 2000
Feedstock and Saleable Product Tank Farms with Pump Stations for pumping feedstock and oil products of USN-2 Unit;Volgograd Company Neftezavodmontazh, Nizhnevartovsk Research and Production Corp., Nizhnevartovsk, TNK-BP;Detailed Design;1999;Commissioned in 2001
Hydrogen-Rich Gas Concentration Unit. Booster Compressor Station;LUKOIL-Permnefteorg-syntez Company, Perm;Detailed Design;2000-2001;Commissioned in 2002
Nitrogen and Oxygen Generation Station and Diesel Fuel Depressant Addition Section (USN4-2);Nizhnevartovsk Oil Refining Corp.;Detailed Design;2002
Off-site facilities of ZMT-250 Motor Fuel Refinery (store, additive injection section and air compressor station);LUKOIL-West Siberia, Oil Refinery within Kogalymneftegaz Company, Kogalym;Detailed Design Documentation;2003-2004;Commissioned in March 2005
Upgrading of Heating Center No. 1, workshop No.14 for Kirishinefteorgsyntez Company;Proekt-Technology Company, St. Petersburg;Detailed Design Documentation;2004;Commissioned in 2006
Construction of central laboratory at Syzran Refinery;Syzran Refinery,
Syzran;Feasibility Study. Detailed Design Documentation;2006;Commissioned in 2007
MTBE Production Complex at OJSC “Syzran Refinery”. Amenity building with distribution substation;OJSC “Syzran Refinery”, Syzran;Design and Detailed Design Documentation;2011-2014;FAU “RF Glavgosexpertisa” favourable conclusion. Licensor – Axens
MTBE Production Complex at OJSC “Syzran Refinery”. Methanol storage and MTBE storage;OJSC “Syzran Refinery”, Syzran;Design and Detailed Design Documentation;2011-2014;FAU “RF Glavgosexpertisa” favourable conclusion. Licensor – Axens
MTBE Production Complex at OJSC “Syzran Refinery”. Intermediate butane-butylene cut tank farm. Intermediate MTBE tank farm;OJSC “Syzran Refinery”, Syzran;Design and Detailed Design Documentation;2011-2014; FAU “RF Glavgosexpertisa” favourable conclusion. Licensor – Axens
MTBE Production Complex at OJSC “Syzran Refinery”. Interconnecting piping lines;OJSC “Syzran Refinery”, Syzran;Design and Detailed Design Documentation;2011-2014;FAU “RF Glavgosexpertisa” favourable conclusion
Control room building with transformer substation, intermediate tank farm and interconnecting piping lines for connection of Pentane-Hexane Cut Isomerization Unit PGI-434 at OJSC “Gazprom neftekhim Salavat”;OJSC “Salavatneftekhimrem-stroy”;Design and Detailed. Design Documentation;2012-2014;FAU “RF Glavgosexpertisa” favourable conclusion. Commissioned in 2017
Firefighting pump house with fire tanks as part of Pentane-Hexane Cut Isomerization Unit PGI-434 at OJSC “Gazprom neftekhim Salavat”;OJSC “Salavatneftekhimrem-stroy”;Design and Detailed. Design Documentation;2012-2014;FAU “RF Glavgosexpertisa” favourable conclusion. Commissioned in 2017
Revamping of LLC “Ilsk Refinery”. Treatment facilities of storm and oily sewage water;LLC “Yuginzhkommun-proekt”;Design and Detailed. Design Documentation;2012-2013;FAU “RF Glavgosexpertisa” favourable conclusion, Rostov Branch Office
Complex of Diesel Oil Hydrotreatment Units at LLC "Afipsk Refinery". Off-site facilities;LLC "Afipsk Refinery";Design Documentation;2013
Modernization of motor oil production in order to provide Euro 4 and 5 quality at Astrakhan Gas Processing Plant. Off-site facilities;LLC "SRDI OG "Peton", Ufa;Detailed Design Documentation;2014
Technical revamping of 1st phase at Orenburg Gas Processing Plant. Off-site facilities;CJSC "Gazprom Invest Yug", LLC "SRDI OG "Peton", Ufa;Design Documentation;2016
LNG production, storage and unloading complex at KS Portovaya. Off-site facilities: - Administrative and service area, - Chemical storage area;CJSC "Gazprom Invest", Linde AG, LLC "SRDI OG "Peton", Ufa;Design Documentation. Detailed Design Documentation;2016-2021;FAU “RF Glavgosexpertisa” favourable conclusion
Complex of Hydroisodewaxing Unit of hydrocracked residue with production of group II and III base oils at LLC "Gazpromneft-SM" – "Omsk lubes production plant".Off-site facilities;LLC "Gazpromneft-SM" - "OZSM";Design Documentation. Detailed Design Documentation;2016-2022;FAU “RF Glavgosexpertisa” favourable conclusion
Amursky Gas Processing Plant. Off-site facilities;LLS TECNIMONT RUSSIA;Detailed Design Documentation;2018-2020
Ethane-containing gas processing complex in the area of Ust' Luga.
Gas processing and gas-chemical plants, gas-chemical complex. Off-site facilities;LLC "SRDI OG Peton";Pre-FEED;2018
3rd and 4th construction stage of JSC “Novashahtinsk Oil Refinery”. Off-site facilities in the scope of Advanced Oil Refining Complex;JSC “Novashahtinsk Oil Refinery”, "SRDI OG "PETON", Ufa; Project Documentation. Detail Design Documentation;2020-2022