No.;Description;Expertise conclusions No.
1; Design documentation and results of engineering surveys for "JSC Novoshakhtinsk Refinery. Construction of Complex for deep refining of crude oil and middle distillates. Kerosene and diesel fuel hydrotreatment unit with capacity 2 160 800 tpy. Off-site facilities"; № 61-1-1-3-001776-2025 21.01.2025
2; Design documentation and results of engineering surveys for "Hydroisodewaxing Complex in LLC "Gazpromneft-SM" affiliate "Omsk Lubes Production Plant"; № 55-1-1-3-084606-2022 01.12.2022
3; Design documentation and results of engineering surveys for JSC Novoshakhtinsk Refinery. Construction of Advanced Oil and Medium Distillates Refining Complex. Combined Hydrocracking Unit (capacity 2 571 thous. tpy) with Hydrogen Production Section (capacity 70 thous. tpy) and off-site facilities”; № 61-1-1-3-009321-2022 18.02.2022
4; Design documentation and results of engineering surveys for "LNG Production, Storage and Unloading Complex Portovaya". Stage 3: Construction of LNG Production, Storage and Unloading Complex “; № в ЕГРЗ 47-1-1-3-014893-2019 17.06.2019
5; Design documentation and results of engineering surveys for "Hydroisodewaxing Complex in LLC "Gazpromneft-SM" affiliate "Omsk Lubes Production Plant"; 314-18/ГГЭ-11927/02 22.03.2018
6; Design documentation and results of engineering surveys for "LNG Production, Storage and Unloading Complex Portovaya". Stage 3: Construction of LNG Production, Storage and Unloading Complex Portovaya; 854-17/ГГЭ-11155/02 15.08.2017
7; Design documentation and results of engineering surveys for "Revamping of Diesel-Oil Hydrotreatment Unit L-24/7 at JSC "Kuibyshev Refinery"; 068-17/ГГЭ-10834/02 27.01.2017
8; Design documentation and results of engineering surveys for “Revamping of unit L-35/11-1000 aimed to reduce operating pressure” at JCS “Kuibyshev Refinery”; 1750-15/ГГЭ-10308/02 22.12.2015
9; Design documentation and results of engineering surveys for “Revamping of combined catalytic cracking unit G-43-107” at OJSC “Gazpromneft-Moscow Refinery”; 1754-15/ГГЭ-10338/02 22.12.2015
10; Design documentation and results of engineering surveys for "Revamping of Hydrotreatment Section at Catalytic Reforming Unit at JSC "NNK-Khabarovsk Oil Refinery"; 040-15/ХГЭ-1723/02 11.02.2015
11; Design documentation and results of engineering surveys for "MTBE Production Complex at OJSC "Kuibyshev Refinery", OC "Rosneft"; 1026-14/ГГЭ-9353/02 25.08.2014
12; Design documentation "Construction of Controller Units 22/4 and Benzene Cut Stabilization Units at LLC "Afipsk Refinery"; 867-13/РГЭ-2608/03 29.11.2013
13; Design documentation and results of engineering surveys for Pentane-Hexane Cut Isomerization Unit at OJSC "Gaspromneftechim Salavat” ; 790-13/ГГЭ-8689/02 13.09.2013
14; Design documentation and results of engineering surveys for "MTBE Production Complex" at OJSC "Syzran Refinery", OC "Rosneft" ; 697-13/ГГЭ-8649/02 22.08.2013
15; Design documentation "MTBE Production Complex at OJSC “Syzran Refinery”. Amenity building with distribution substation"; 0246-13/СГЭ-2961/03 21.06.2013
16; Design documentation “Complex of Isomerization Unit PGI-DIH/280-NK” for OJSC “Novokuibyshevsk Refinery”, OC “Rosneft”; 278-12/ГГЭ-7871/02 05.04.2012
17; Design documentation “Complex of Isomerization Unit PGI-DIH/280-K” for OJSC “Kuibyshev Refinery”, OC “Rosneft”; 227-12/ГГЭ-7833/02 15.03.2012
18; Detailed design for “LLC ”Nizhevartovsk NPO”. Revamping of shop No.3 column section. Installation of reboilers”; 337-09/ГГЭ-1102/02 21.12.2009
19; Approvals package of detailed design “Revamping of Catalytic Reforming Unit ЛЧ-35-11/600 for OJSC “Syzran Refinery”, OC “Rosneft”; 760-09/ГГЭ-6411/02 02.12.2009
20; Approvals package of detailed design “Revamping of Catalytic Reforming Unit ЛЧ-35-11/600 for OJSC “Syzran Refinery”, OC “Rosneft”; 702-09/ГГЭ-6381/02 12.11.2009
21; Approvals package of detailed design “Complex of Isomerization Unit with DHT hydrotreating PGI-DIH/280 for OJSC “Syzran Refinery”, OC “Rosneft”; 368-09/ГГЭ-6124/02 19.06.2009
22; Project “Wax Hydtrotreating Section of 40/3 Deoiling Unit at LLC “LUKOIL- Nizhegorodnefteorgsyntez”; 556-08/ГГЭ-5601/02 26.08.2008
23; Project “Revamping of Khabarovsk oily and rainy water treatment faculties at petroleum storage depot of OJSC “Khabarovsknefteproduct”; 092-08/ХГЭ-0141/02 22.07.2008
24; Feasibility Study (Studiya “Proekt”) for Hydroprocessing Complex at OJSC “Khabarovsk Refinery, OC ”Alliance”; 27/18-07 17.04.2007